Large span Pressing machine Specification
Item |
Unit |
Parameter |
Remark |
Material |
Type |
|
PPGI, PPGL, GI, GL, PPAL |
Thickness of Material |
mm |
0.2-1.0mm |
Weight |
kg |
12000 kg |
Material Width |
mm |
914-1650 |
Production Speed |
m/min |
Common speed: 0-5m/min |
High speed: 30-60m/min |
Effective Width of Product |
mm |
760-1260mm |
Roller Material |
|
45#, Cr12, GCr15, GCr12MoV |
Power |
|
220v 60hz 3 phrase or as your request |
Drive Type |
|
By Chain or Gear or Gearbox |
Motor Power |
kW |
5.5-15kW |
Brand of Electric Control System |
|
Delta or Siemens |
Dimension ( L* W * H ) |
m |
8 m*1.3m*1.5m |
Product Details
HOT POPULAR Ag/Tuff Rib Panel 5 rib and PBR/R-Panel 4 rib NEW DOUBLE DECK Roll Former Machine
Popular TR4 TR5 TR6 /PV4 PV5 PV6 PROFILE PANEL ROLL FORMING MACHINE



Application Effect
Packaging & Shipping
After-sales And Warranty
1. Warranty period: 1 year or 2000 working hours
2. Pay attention to the warranty scope
3. If the customer reports a quality problem, the following information must be provided:
1) Please verify the working time of the whole machine (nameplate photo, instrument photo)
2) Make a clear statement or cause analysis of the failure of the component (provide working environment, pictures, videos)
3) Give us feedback as soon as possible
FAQ
Q1:1:What is your minimum order quantity?
----1unit, customized service is available
Q2:How Long for lead time ?
----If the parts are in stock, it is usually delivered within 10 working days. Other customized styles take about 20 working days. It depends on the customer's requirements for the forklift
Q3:How long is your warranty period?
---1 year or 2000 working hours
Q4: What payment terms do you accept?
---1) T/T 30% in advance as deposit,70% before loading
---2) T/T30% as deposit ,40% after inspection forklift ,30% before loading ----3) T/T20% as deposit ,50% after inspection forklift ,30% against BL copy
Q5:How about the shipping term ?
---1)LCL By Sea
---2)20GP/40HQ/45FT
---3)By Bulk Cargo