Factory Hot Wire Drawing Machine with Short Delivery Time

Product Details
Customization: Available
After-sales Service: Parts Replacement
Warranty: 1year /2000 Work Hours
Diamond Member Since 2022

Suppliers with verified business licenses

Registered Capital
10000000 RMB
Plant Area
1001~2000 square meters
  • Factory Hot Wire Drawing Machine with Short Delivery Time
  • Factory Hot Wire Drawing Machine with Short Delivery Time
  • Factory Hot Wire Drawing Machine with Short Delivery Time
  • Factory Hot Wire Drawing Machine with Short Delivery Time
  • Factory Hot Wire Drawing Machine with Short Delivery Time
  • Factory Hot Wire Drawing Machine with Short Delivery Time
Find Similar Products
  • Overview
  • Product Details
  • Packaging & Shipping
  • Main Features
  • After-sales And Warranty
  • FAQ
Overview

Basic Info.

Model NO.
FO-1098
Usage
Wire
Metal Material
Copper/Steel/Aluminum/Stainless Steel
Outlet Diameter
0.1-1.2/0.5-4.5/0.4-3.5/0.5-6.0/0.5-7.0/6.5-24/<20
Max.Inlet Wire Dia.
2.8/3.6/8/4.1/5/6.5/10/16/14/22mm
Block Dia.
160/220/280/300/350/400/450/500/700/900/1200mm
Max. Number of Block
10/11/12/15/20
Certification
REACH, RoHS, ISO
Condition
New
Suitable Material
Medium High Carbon Steel Wire
Cooling System
Water Cycle
Drawing Speed
12 M/S
Voltage
220V/380V/415V/440V
Power
22kw/30kw
Core Components
Motor, PLC
Transport Package
Container
Specification
1.3m*1.8m*1.3m
Trademark
Five Oceans
Origin
China

Product Description

         Wire Drawing Machine Specification
Capstan diameter 560mm
Capstan number 11
Inlet wire diameter Φ6.0mm-Φ8.0mm
Outlet wire diameter Φ2.0mm-Φ3.0mm
Tensile strength ≤600mpa
Total compressibility 90.53%
Average compressibility 25.52%
Max. Speed 12 m/s
Power 22 KW*11 (Frequency conversion motor )+22KW*11(inverter)
Mold size Φ40mm×25
Block type Vertical ,tilted
Take-up wire Elephant trunk type take-up system
Die box The mould box is composed of mixer and water cooling(4 set)
Drawing drum Cast steel ZG45, surface surfacing and spraying tungsten carbide, HRC60. Surface roughness less than 0.8mm.
Mold box cooling The drawing die is cooled by direct water inlet and water outlet, and the cooling effect is very good.
Tension frame Internal tension frame.
Main frame Welding of steel plate and square pipe.
Stop brake Pneumatic brake
Vacuuming design Reserve suction hole
Lighting Each stand with separate lighting.
PLC Siemens
Touch screen Siemens
Low voltage electrical appliances Delixi
Product Details

Factory Hot Wire Drawing Machine with Short Delivery TimeFactory Hot Wire Drawing Machine with Short Delivery Time
Factory Hot Wire Drawing Machine with Short Delivery Time
Factory Hot Wire Drawing Machine with Short Delivery Time

Factory Hot Wire Drawing Machine with Short Delivery TimeFactory Hot Wire Drawing Machine with Short Delivery TimeFactory Hot Wire Drawing Machine with Short Delivery Time
Factory Hot Wire Drawing Machine with Short Delivery Time
Packaging & Shipping
Factory Hot Wire Drawing Machine with Short Delivery Time

Factory Hot Wire Drawing Machine with Short Delivery TimeFactory Hot Wire Drawing Machine with Short Delivery Time

Main Features

1) Easy in installation and maintation. 

2) Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation parts. 

3) Running in a high automatization and intellectualization,no pollution 

4)As the use of the frequency technology, changes in the larger context of parts of the compression ratio to meet the wide range of technology and high speed drawing. 

5)Good cooling system, final wire quality is very good.

After-sales And Warranty

1. Warranty period: 1 year or 2000 working hours
2. Pay attention to the warranty scope
3. If the customer reports a quality problem, the following information must be provided:
1) Please verify the working time of the whole machine (nameplate photo, instrument photo)
2) Make a clear statement or cause analysis of the failure of the component (provide working environment, pictures, videos)
3) Give us feedback as soon as possible

FAQ

Q1:1:What is your minimum order quantity?
----1unit, customized service is available
Q2:How Long for lead time ?
----If the parts are in stock, it is usually delivered within 10 working days. Other customized styles take about 20 working days. It depends on the customer's requirements for the forklift
Q3:How long is your warranty period?
---1 year or 2000 working hours
Q4: What payment terms do you accept?
---1) T/T 30% in advance as deposit,70% before loading
---2)  T/T30% as deposit ,40% after inspection forklift ,30% before loading ----3) T/T20% as deposit ,50% after inspection forklift ,30% against BL copy
Q5:How about the shipping term ?
---1)LCL By Sea
---2)20GP/40HQ/45FT
---3)By Bulk Cargo

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier