Customization: | Available |
---|---|
After-sales Service: | Provided |
Usage: | Wire, Bar, Rebar,Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Place of Origin | Shanghai, China |
Video outgoing-inspection | Provided tube straightening cutting machine |
Machinery Test Report | Provided tube straightening cutting machine |
Warranty of core components | 1 Year tube straightening cutting machine |
Core Components | PLC |
Power (kW) | 1.12 |
Key Selling Points | tube straightening cutting machine |
Warranty | 1 Year tube straightening cutting machine |
Applicable Industries | Building Material Shops, Machinery Repair Shops |
No-load Speed(rpm) | 60 rpm |
Voltage | 380 tube straightening cutting machine |
Dimension(L*W*H) | 2300*650*1300 |
output power | 1.12KW tube straightening cutting machine |
Feeding speed | 60m/min tube straightening cutting machine |
Least cutting length | 60mm tube straightening cutting machine |
Input voltage | 380V,three-phase, 50Hz tube straightening cutting machine |
Tube material | copper/aluminum/bundy tube straightening cutting machine |
Single package size | 200X10X30 cm |
Single gross weight | 60.000 kg |
1. Warranty period: 1 year or 2000 working hours
2. Pay attention to the warranty scope
3. If the customer reports a quality problem, the following information must be provided:
1) Please verify the working time of the whole machine (nameplate photo, instrument photo)
2) Make a clear statement or cause analysis of the failure of the component (provide working environment, pictures, videos)
3) Give us feedback as soon as possible
Q1:1:What is your minimum order quantity?
----1unit, customized service is available
Q2:How Long for lead time ?
----If the parts are in stock, it is usually delivered within 10 working days. Other customized styles take about 20 working days. It depends on the customer's requirements for the forklift
Q3:How long is your warranty period?
---1 year or 2000 working hours
Q4: What payment terms do you accept?
---1) T/T 30% in advance as deposit,70% before loading
---2) T/T30% as deposit ,40% after inspection forklift ,30% before loading ----3) T/T20% as deposit ,50% after inspection forklift ,30% against BL copy
Q5:How about the shipping term ?
---1)LCL By Sea
---2)20GP/40HQ/45FT
---3)By Bulk Cargo