Tube Remove Hydraulic Pump Pipe Stretching Device Cylinder Casing Pipe Pulling Machine 100t Ground Pile Lifting Machine
Product Details
| Customization: | Available |
|---|---|
| After-sales Service: | Provided |
| Warranty: | Provided |
Shipping
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Payment Guarantee
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Secured Trading Service
Gold Member Since 2025
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Importers and Exporters
High Repeat Buyers Choice
Fast Delivery
R&D Capabilities
The supplier has import and export rights
More than 50% of buyers repeatedly choose the supplier
The supplier can deliver the goods within %s days
The supplier has %s R&D engineers, you can check the %arLink for more information
Sign In to see all verified strength labels (13)
Find Similar Products
Basic Info.
- Type
- Hydraulic Pile Extractor
- Pressure Pile Driver Type
- Hydraulic Pile Driver
- Pile Hammer Type
- Hydraulic Hammer
- Power Source
- Hydraulic Power Pack
- Motor Power
- 44kw
- Noise
- Without Noise
- Certification
- CE, ISO 9001:2008
- Condition
- New
- Color
- Blue or as Customer Request
- Normal Work Pressure
- 32 MPa
- Rated Pile Drawing Force
- 220t
- Max. Flow
- 160L/Min
- Max Clamping Force
- 260t
- Weight
- 7tons
- Volume
- 11cbm
- Delivery Time
- 1-10 Days
- OEM
- OEM
- Shipping Mark
- as Per Customer Request
- Power
- 45kw
- Transport Package
- Hydraulic Power Pack
- Specification
- Standard
- Trademark
- Five Oceans
- Origin
- China
- Production Capacity
- 50000pieces/Year
Packaging & Delivery
- Package Size
- 4400.00cm * 2250.00cm * 1750.00cm
- Package Gross Weight
- 75000.000kg
Product Description
Products Description
The hydraulic pipe puller is a supporting equipment for drilling machinery, used to pull out the casing and drill rod for the next drilling. When the slips clamp the casing or drill rod, the reciprocating motion of the cylinder pulls out the casing and drill rod.
Specification
Applications
Pile extractors are used to extract underground piles (steel sheet piles, concrete piles, etc.). Their application scenarios can be summarized into five major areas:
Construction Engineering: Recovering foundation pit support piles, removing temporary load-bearing piles, and clearing old building foundation piles to reduce costs and eliminate construction obstacles;
Transportation Engineering: Recovering temporary support piles and removing old isolation/crash-avoidance piles after road reconstruction/bridge/railway construction;
Water Conservancy Engineering: Removing temporary cofferdams, replacing old flood control embankment piles, and clearing old riverbank/dock piles to ensure water flow and flood discharge;
Temporary/Emergency Engineering: Recovering temporary building foundation piles, clearing obstacles during sudden disasters, and removing temporary protective piles after rescue operations, ensuring efficient response;
Special Applications: Removing old pile foundations at ports and docks, removing temporary support piles in mines, and recovering greenhouse/plank road foundation piles in agriculture and forestry.
Construction Engineering: Recovering foundation pit support piles, removing temporary load-bearing piles, and clearing old building foundation piles to reduce costs and eliminate construction obstacles;
Transportation Engineering: Recovering temporary support piles and removing old isolation/crash-avoidance piles after road reconstruction/bridge/railway construction;
Water Conservancy Engineering: Removing temporary cofferdams, replacing old flood control embankment piles, and clearing old riverbank/dock piles to ensure water flow and flood discharge;
Temporary/Emergency Engineering: Recovering temporary building foundation piles, clearing obstacles during sudden disasters, and removing temporary protective piles after rescue operations, ensuring efficient response;
Special Applications: Removing old pile foundations at ports and docks, removing temporary support piles in mines, and recovering greenhouse/plank road foundation piles in agriculture and forestry.


Tube Remove Machine
A pile puller is a special engineering equipment used to pull out piles (such as steel sheet piles, concrete piles, steel pipe piles, etc.) that have been driven into the ground. Its core function is to recover pile materials, clean up the construction site or create conditions for subsequent projects.



Technical Specifications
Pull force | 100t |
Lifting stroke | 500mm |
Inner diameter | 140mm |
Pumping station pressure | 31.5MPa |
Weight | 200KG |
Power | 5.5kw |
Certification | iso |
Drilling depth | 10(m) |
Drilling angle range | 30(°) |
After Sales Service
Standard Warranty: 12 months or 2,000 operating hours (whichever comes first).
Extended Warranty: Optional coverage up to 36 months.
Global Support: 24/7 technical assistance and spare parts supply.
Training: On-site or remote operation/maintenance training.
Extended Warranty: Optional coverage up to 36 months.
Global Support: 24/7 technical assistance and spare parts supply.
Training: On-site or remote operation/maintenance training.
Company Profile

Tianjin Five Oceans Machinery Manufacturing Co., Ltd.
FIVE OCEANS specializes in the production of metal processing machinery and heavy machinery such as forklifts, balers, tile presses, nail making machines, pipe bending machines, cutting machines, including pipe pulling machines, pile pulling machines, etc., with a wide variety of products. At the same time, it provides customers with intelligent logistics overall solutions and industrial vehicle after-market business, including product OEM production, parts sales, maintenance, leasing, remanufacturing, talent training, etc. In the future, Wuyang will continue on the road of research and development, production and manufacturing, and continue to expand the global market. In response to the country's major strategies such as "carbon peak, carbon neutrality" and carbon reduction "3060 goals", the company actively deploys product new energy strategies, focusing on the research and development of various new energy products such as lithium batteries and hydrogen fuel cells, in order to achieve product strategic transformation and upgrading and high-quality development goals.


Why Choose Us?
Other Products
OEM/ODM capabilities
Competitive pricing & bulk discounts
Fast shipping & customs clearance support
Turnkey project solutions
Competitive pricing & bulk discounts
Fast shipping & customs clearance support
Turnkey project solutions
forklifts, balers, tile presses, nail making machines, pipe bending machines, cutting machines, including pipe pulling machines, pile pulling machines, etc
FAQ
Q1:1:What is your minimum order quantity?
----1unit, customized service is available
Q2:How Long for lead time ?
----If the parts are in stock, it is usually delivered within 10 working days. Other customized styles take about 20 working days. It depends on the customer's requirements for the forklift
Q3:How long is your warranty period?
---1 year or 2000 working hours
Q4: What payment terms do you accept?
---1) T/T 30% in advance as deposit,70% before loading
---2) T/T30% as deposit ,40% after inspection forklift ,30% before loading
----3) T/T20% as deposit ,50% after inspection forklift ,30% against BL copy
Q5:How about the shipping term ?
---1)LCL By Sea
---2)20GP/40HQ/45FT
---3)By Bulk Cargo
----1unit, customized service is available
Q2:How Long for lead time ?
----If the parts are in stock, it is usually delivered within 10 working days. Other customized styles take about 20 working days. It depends on the customer's requirements for the forklift
Q3:How long is your warranty period?
---1 year or 2000 working hours
Q4: What payment terms do you accept?
---1) T/T 30% in advance as deposit,70% before loading
---2) T/T30% as deposit ,40% after inspection forklift ,30% before loading
----3) T/T20% as deposit ,50% after inspection forklift ,30% against BL copy
Q5:How about the shipping term ?
---1)LCL By Sea
---2)20GP/40HQ/45FT
---3)By Bulk Cargo
Send your message to this supplier
People who viewed this also viewed
Product Groups
Find Similar Products By Category
- Supplier Homepage
- Products
- Heavy Machinery
- Tube Remove Machine
- Tube Remove Hydraulic Pump Pipe Stretching Device Cylinder Casing Pipe Pulling Machine 100t Ground Pile Lifting Machine
Related Categories
Hot Searches
More